Project
2014
Abasha-Tekhura between-rivers massive drainage system's main tailrace-water channels rehabilitation (I row)
Abasha-Tekhura between-rivers massive drainage system's main tailrace-water channels rehabilitation (I row).
The result: Removal of Surplus Water - 732 HA.